Inputs
- Verified permit
- Action payload and target resource
- Adapter configuration
Runtime and execution
Execute only under a verified permit.
Controlled execution and resource adapters that apply an action and support independent read-back.
Responsibility
Substrate provides the controlled execution boundary. It verifies a permit before applying an effect through a bounded adapter, then supports read-back so the result can be observed rather than assumed.
Substrate is the component that actually touches the world. Its contract is narrow: verify the permit, apply the effect through an adapter with a defined blast radius, and make the resulting state observable.
It is presented as a reference execution boundary rather than a universal driver layer. The effect is a local file/cgroup worker, and the read-back reads the same local effect store rather than an independent third-party source.
Lifecycle position
Stage numbering is canonical across the site. Open the interactive lifecycle to see every component with responsibilities at each stage.
Apply the effect through a controlled adapter.
Record what the external state actually is.
Verified capabilities
Capabilities are drawn from the product register. Each one is bounded by the limitations stated further down this page.
Evidence and maturity
Maturity describes verified engineering evidence in a bounded environment. It is not a production-readiness statement.
A reference execution boundary with permit verification, execute and effect read-back was exercised in the recorded local chain. Its own README describes the boundary as parked, and the demonstrated Control Plane path uses it; that discrepancy (D-1) is unresolved.
This label describes verified engineering evidence only. No production deployment, certification, benchmark or customer outcome is claimed.
Dependencies are stated as the product register records them. A dependency is not automatically production-qualified; see its own product or component page for its maturity and limitations.
Limitations
Limitations are stated before the evaluation questions so they cannot be missed, downplayed or treated as future-work footnotes.
No capability on this page should be read as production qualification. If a limitation is material to your use case, it belongs in the evaluation scope — not after it.
Relationship to the platform
Substrate executes what NARG dispatches and what Gatekeeper admitted. It is the last enforcement point and the first source of observed state for reconciliation.
Next step
Bring a system boundary, an action class and a failure mode. The first step is to agree what should be governed and what evidence would count.