Inputs
- Actor-supplied intent declaration and success conditions
- Identity assertions and tenant context
- Obligations, invariants and scope constraints
- Evidence references from runtime and observation components
Intent and authority
Make the promise explicit before action.
Intent governance, actor identity and authority, obligation tracking, evidence sufficiency, conformance and drift.
Responsibility
Chinje establishes what an actor intends to achieve, which obligations and scope apply, who is authorised to act, and whether the evidence available is sufficient to proceed. It keeps the intent version chain and supports conformance and drift assessment against the original obligations.
An autonomous system is only governable if its intent is inspectable. Chinje turns a declared objective into a versioned, reviewable intent with explicit obligations, scope and authority requirements, so later decisions can be checked against something concrete rather than inferred from a prompt or a log line.
Chinje sits at the start and the end of the governance lifecycle. It provides the authoritative intent that the Intent-to-Control Bridge translates into enforceable requirements, and it supplies the original obligations against which observed outcomes are later assessed for conformance and drift.
Lifecycle position
Stage numbering is canonical across the site. Open the interactive lifecycle to see every component with responsibilities at each stage.
Declare the objective, obligations and scope.
Evaluate outcomes against the original obligations.
Verified capabilities
Capabilities are drawn from the product register. Each one is bounded by the limitations stated further down this page.
Evidence and maturity
Maturity describes verified engineering evidence in a bounded environment. It is not a production-readiness statement.
Verified in the local demonstration stack: an intent was authored, approved by a distinct principal, published and read back by version. Intent read-by-id was independently probed in the November 2026 capability audit.
This label describes verified engineering evidence only. No production deployment, certification, benchmark or customer outcome is claimed.
Dependencies are stated as the product register records them. A dependency is not automatically production-qualified; see its own product or component page for its maturity and limitations.
Limitations
Limitations are stated before the evaluation questions so they cannot be missed, downplayed or treated as future-work footnotes.
No capability on this page should be read as production qualification. If a limitation is material to your use case, it belongs in the evaluation scope — not after it.
Relationship to the platform
Chinje is the authority for what was intended. It does not execute actions and does not issue permits. Its published intent becomes the input to the Bridge and λ-Safe, and its obligations become the reference point for conformance after reconciliation.
Next step
Bring a system boundary, an action class and a failure mode. The first step is to agree what should be governed and what evidence would count.