Kernel capabilities implemented. End-to-end platform integration and qualification are progressing.Interactive demonstrationPlatform status

Control and decision

Confidence Estimator

Uncalibrated confidence, stated as uncalibrated.

In-process evidence-sufficiency scoring and an explicitly uncalibrated confidence object attached to decision metadata.

Implemented1 lifecycle positionNon-production evidence

Responsibility

What Confidence Estimator is responsible for

The Confidence Estimator module in the Control Plane records how sufficient the available evidence is for a decision and attaches a confidence object to decision metadata. In the reviewed implementation that object is explicitly uncalibrated: it reports calibrated:false, probability 0 and method "none" rather than inventing a risk score.

Most systems encode uncertainty in an implicit threshold: a model returns a score, a rule cuts it, and confidence becomes invisible. NiGeNje's design intent is the opposite — uncertainty should be an input a decision can reason about and an auditor can inspect.

What exists today is more modest and more honest than a risk engine: an evidence-sufficiency score and a confidence object that declares itself uncalibrated. No calibrated probability, threshold ownership or control effect is claimed.

Lifecycle position

Where it sits in the governance lifecycle

Stage numbering is canonical across the site. Open the interactive lifecycle to see every component with responsibilities at each stage.

  1. Decision

    Coordinate policy, constraints and uncertainty.

Verified capabilities

What is verified today

Capabilities are drawn from the product register. Each one is bounded by the limitations stated further down this page.

  • Evidence-sufficiency scoring for a decision context (in-process)
  • Explicit uncalibrated confidence metadata (calibrated:false, probability 0, method none)
  • Post-solve chance and CVaR analysis in the IDM path (bounded, synthetic)

Inputs

  • Evidence quality signals
  • Decision context
  • Post-solve analysis inputs

Outputs

  • Evidence-sufficiency finding
  • Explicitly uncalibrated confidence metadata
  • Explicit unknown when confidence cannot be established

Evidence and maturity

What the evidence supports

Maturity describes verified engineering evidence in a bounded environment. It is not a production-readiness statement.

Implemented

Maturity note

An in-process evidence-sufficiency and confidence-metadata module is present in the Control Plane. It does not own thresholds or influence control decisions, and it explicitly reports an uncalibrated state.

Not production-qualified

This label describes verified engineering evidence only. No production deployment, certification, benchmark or customer outcome is claimed.

Evidence recorded

  • Control Plane engines/model source: evidence-sufficiency and confidence metadata with calibrated:false.
  • Confidence/AIOps scheduling report documenting the uncalibrated state.
  • Known-limitations register entry 7 records synthetic CLF/CBF and post-solve chance/CVaR handling.

Dependencies

  • Control Plane
  • IDM Solver
  • evidence records

Dependencies are stated as the product register records them. A dependency is not automatically production-qualified; see its own product or component page for its maturity and limitations.

Limitations

What this product does not do (yet).

Limitations are stated before the evaluation questions so they cannot be missed, downplayed or treated as future-work footnotes.

Limitations — read before evaluating
  • No calibrated estimator, probability model or risk score is implemented in the reviewed code.
  • The module is in-process Control Plane metadata; it owns no threshold and has no control effect.
  • No calibration, accuracy or benchmark claim is made.
  • Where uncertainty cannot be estimated, the honest state is unknown — not a default confidence value.

No capability on this page should be read as production qualification. If a limitation is material to your use case, it belongs in the evaluation scope — not after it.

Relationship to the platform

How it fits

The estimator, where present, informs but does not authorise. It cannot issue a permit, and a high confidence value does not substitute for missing evidence.

Evaluation questions

  1. What evidence does the risk signal depend on?
  2. How are uncalibrated estimates prevented from becoming implicit authorisation?
  3. Is uncertainty visible to the reviewer or collapsed into a boolean?

Next step

Evaluate Confidence Estimator against a real control problem.

Bring a system boundary, an action class and a failure mode. The first step is to agree what should be governed and what evidence would count.