Inputs
- Expected postconditions from intent and contract
- Observed external state
- Decision, permit and execution records
Assurance and evidence
A successful response is not proof of outcome.
Independent observation, expected-versus-observed reconciliation and linked evidence across the audit ledger.
Responsibility
This capability group establishes what actually happened. An observer records external state, reconciliation compares expected and observed results, and the certification and audit ledger links decision, execution and outcome evidence so conformance can be evaluated rather than asserted.
Executor responses are claims. Reconciliation treats them as such: it compares the required postcondition against observed state and records DIVERGED, UNKNOWN or CONFORMANT rather than inheriting the executor's opinion.
The audit ledger is the durable spine. Each component keeps an ordered, hash-linked chain, and conformance evaluation reads those records instead of trusting a status flag. What is not yet true is one signed envelope spanning every component — correlation is by identifier.
Lifecycle position
Stage numbering is canonical across the site. Open the interactive lifecycle to see every component with responsibilities at each stage.
Record what the external state actually is.
Compare expected and observed results.
Keep linked, ordered, reviewable records.
Evaluate outcomes against the original obligations.
Verified capabilities
Capabilities are drawn from the product register. Each one is bounded by the limitations stated further down this page.
Independent Observation records external state after an action. Reconciliation compares that state with the required postcondition. The Certification and Audit Ledger keeps the linked decision, execution and outcome records that make review possible.
Evidence and maturity
Maturity describes verified engineering evidence in a bounded environment. It is not a production-readiness statement.
Reconciliation and hash-linked audit chains were verified in the local demonstration stack, including divergent-outcome detection. No single signed lifecycle artefact spans every component, and NARG's effect observation is performed by NARG rather than a third-party observer.
This label describes verified engineering evidence only. No production deployment, certification, benchmark or customer outcome is claimed.
Dependencies are stated as the product register records them. A dependency is not automatically production-qualified; see its own product or component page for its maturity and limitations.
Limitations
Limitations are stated before the evaluation questions so they cannot be missed, downplayed or treated as future-work footnotes.
No capability on this page should be read as production qualification. If a limitation is material to your use case, it belongs in the evaluation scope — not after it.
Relationship to the platform
This is the evidence back-edge of the lifecycle. Intent and conformance meet here: the original obligations are re-read against verified outcomes, and the result is available to the people accountable for the system.
Next step
Bring a system boundary, an action class and a failure mode. The first step is to agree what should be governed and what evidence would count.