Inputs
- Event timestamps and scheduling context
- Cadence configuration
- Decision and execution records
Operations
A temporal scheduler inside the control plane.
NiZiNG Temporal Controller — an in-process temporal scheduler and cadence controller. Not a causal validation engine.
Responsibility
NTC is an in-process temporal scheduler and cadence controller in the Control Plane, with ingress and status surfaces. It schedules and paces work. It is not a separate causal-DAG clock, and the reviewed ADAPTIVE mode is refused at startup.
Distributed systems disagree about time. NTC provides temporal scheduling and cadence inside the Control Plane so work can be paced and observed rather than relying on wall-clock assumptions alone.
The capability is presented as in progress because the reviewed evidence supports a scheduler, not a causal validation engine. The separate causal-DAG temporal clock described in some architecture material was not found, and live feedback behaviour was not demonstrated.
Lifecycle position
Stage numbering is canonical across the site. Open the interactive lifecycle to see every component with responsibilities at each stage.
Coordinate policy, constraints and uncertainty.
Keep linked, ordered, reviewable records.
Verified capabilities
Capabilities are drawn from the product register. Each one is bounded by the limitations stated further down this page.
Evidence and maturity
Maturity describes verified engineering evidence in a bounded environment. It is not a production-readiness statement.
The scheduler, cadence and status/ingress surfaces exist and are partially integrated. The current Control Plane controller reports configured=false, the console route returns 503 for it, ADAPTIVE mode is not eligible, and OBSERVE/SHADOW do not change timers.
This label describes verified engineering evidence only. No production deployment, certification, benchmark or customer outcome is claimed.
Dependencies are stated as the product register records them. A dependency is not automatically production-qualified; see its own product or component page for its maturity and limitations.
Limitations
Limitations are stated before the evaluation questions so they cannot be missed, downplayed or treated as future-work footnotes.
No capability on this page should be read as production qualification. If a limitation is material to your use case, it belongs in the evaluation scope — not after it.
Relationship to the platform
NTC supplies the time dimension for decisions and evidence. It does not authorise actions; it makes the ordering of governed events reviewable.
Next step
Bring a system boundary, an action class and a failure mode. The first step is to agree what should be governed and what evidence would count.